Project Description
Frameless Shower Enclosure 2/3 Neo Angle with Buttress Return on Tub Deck
This shower enclosure utilized a header for extra support for the oversized panel, on the tub deck. A curb dam was placed at the bottom to help the water run in due to the curb being pitched out instead of in. To avoid needing a curb dam make sure that your curb is properly pitched in (at least 1/8”) during the building process.
You must be logged in to post a comment.